01
The model list, or the specification
Model designations with quantities if you have them. A drawing extract, a bill of materials or a written specification all work. A photograph of a printed schedule is fine.
Component supply only. We do not design, install or commission fire protection systems.
Shenzhen, CN Ex-works / FOB sales@ems-safety.com
Page 09 / Contact
Component buyers shop from a list, so a list is what we quote from. Paste a drawing extract, a bill of materials or a set of model designations with quantities, and you get unit prices, lead time, the model list as we will supply it, and the document pack for the lines involved.
01 / Enquiry
Seven fields. The model list matters more than all of the others combined.
Direct
sales@ems-safety.com
Shenzhen, Guangdong, China
Monday to Friday, 09:00 to 18:00 GMT+8
Replies within one business day
Telephone and messaging
Direct telephone and messaging numbers for your region are issued with the quotation, so that you are speaking to the person who priced the order rather than to a switchboard. Email is monitored throughout the working day.
Scope reminder
We supply components. We do not design, install, commission or service fire protection systems, and we are not the installing contractor of record. If your enquiry is a system design or an installation package, we are the wrong supplier and we will say so rather than quote around it.
02 / Before you send
01
Model designations with quantities if you have them. A drawing extract, a bill of materials or a written specification all work. A photograph of a printed schedule is fine.
02
K-factor and temperature rating for heads, sizes for valves and switches, agent for clean agent equipment, area classification for gas detection, thresholds and route lengths for cable.
03
The delivery country and port, and whether you want EXW, FOB, CIF or DAP. Destination drives the document set as much as it drives the freight.
04
If there is a submission date or a site date, say so. If you need a sample for approval before production, say that too, because it changes the lead time rather than adding to it afterwards.
03 / What happens next
Step 01
A reply with unit prices, lead time, Incoterms, the model list as we will supply it, and the document pack for the lines involved. If something on your list cannot be matched, the reply says so and says why.
Step 02
Samples for approval where the project needs them, and a confirmation of the exact designations against your drawing extract, character by character, before anything is manufactured.
Step 03
Stocked lines go out in 3 to 10 working days. Made to order lines run 3 to 6 weeks. The packing list is issued before the goods leave, and the shipping documents follow the shipment.
Stocked against made to order
The six product pages state which specification is held in stock. Anything outside it is quoted against the listing model list, with the lead time attached to the line rather than promised as a general figure. If a date is tight, tell us the date and we will say whether it is achievable before you commit to it.
04 / Scope
Already have the list
If the form is not convenient, send the list straight to the sales address. Attachments, scans and spreadsheets are all fine.